所在位置:首页 > 新闻资讯 > 商场设计 > 深圳标识设计正规的成果要求。

深圳标识设计正规的成果要求。

发表时间:2020-09-05 15:50:02 资料来源:人和时代 作者:CRT标识设计公司

深圳标识设计正规的成果要求。

        设计服务分为三个阶段,包括概念设计、深化设计和设计与其他专业配合阶段。各阶段满足下列内容外,还要满足国家规范、符合行业设计深度标准,严格按照设计合同或招标文件中规定的时间保质保量地提供相应成果,投标人需根据国家有关设计承揽要求承担设计责任。

1、设计成果提交形式:A3文本6份;电子版设计文件(PPT电子文件、CAD电子文件、AI电子文件 )

2、过程中,配合招标人组织、参与针对成果的各阶段,各类评审、论证的会议,配合各专项技术对接、各专业配合提资及合图。

1、 配合招标人组织并参与后期成果的培训、专利申请等。


时间要求:

工作内容

起始时间

结束时间

备注

方案初步设计

 

 

成果要求见设计任务书

方案初步设计汇报及调整

 

 

汇报文件需提前3个工作日发至招标人对接人处

深化设计

 

 

成果要求见设计任务书

招标、施工服务阶段

以项目进度为准

成果要求见设计任务书

 注:以上时间为暂定时间,具体时间可随项目进度调整;各个阶段的详细计划,由双方另行商议。


Shenzhen logo design formal results requirements. 



The design service is divided into three stages, including conceptual design, deepening design and design and other professional cooperation stages. In addition to meeting the following content at each stage, it must also meet national specifications and meet industry design depth standards, and provide corresponding results in strict accordance with the time specified in the design contract or bidding document, and the bidder shall bear the design responsibility according to the relevant national design contract requirements .

1. Design results submission form: 6 copies of A3 text; electronic design documents (PPT electronic files, CAD electronic files, AI electronic files)

2. In the process, cooperate with the tenderer to organize and participate in various stages of results, various review and demonstration meetings, and cooperate with each special technology docking, and each professional to cooperate with the capital raising and drawing together.

1. Cooperate with the tenderer to organize and participate in the training and patent application of the later results.

time requirement:

Work content

Start time

End Time

Remarks

Preliminary design

See the design task book for the result requirements

Project preliminary design report and adjustment

The report documents need to be sent to the tenderer's docking office 3 working days in advance

Deepen the design

See the design task book for the result requirements

Bidding, construction service stage

Subject to project progress

See the design task book for the result requirements

 Note: The above time is a tentative time, the specific time can be adjusted with the progress of the project; the detailed plan of each stage will be discussed separately by both parties.

   

 


关健词:

人和时代设计

品牌设计、VI设计、标识设计公司

查看
点击查看更多案例 +